Abstract
Standards and ontologies for manufacturing understand resources differently. Because of this heterogeneity, misunderstandings arise concerning the basic features that characterize them. The purpose of the paper is to investigate how to ontologically model resources with the goal of facilitating the development of knowledge representation models for manufacturing. By reviewing the literature, we discuss and compare three approaches for the representation of resources depending on whether they are conceived in connection to either processes, plans or goals. By addressing the advantages and shortcomings of each view, we present a unifying perspective to enable the modeling of resources in an integrated manner. In this way, the intended meanings of the used notions are harmonized and, as a result, one can facilitate multiple experts to interact e.g., via data sharing and/or data integration procedures. Differently, by keeping three separated views, there is no guarantee that data coming from different parties will share common meanings even if the same terms are used. By the end of the paper, we present a case study to show the application of our approach and to compare it with an existing ontology for manufacturing.
Introduction
The concept of resource is fundamental in various domains. Being a general term, it has been used in a variety of communities without becoming the subject of specific definitions, thus relying on the implicitly shared viewpoint among the community’s members. This lack of characterization and the possible mismatches in the understanding of the term jeopardize efforts to share data models as well as to integrate information systems and services. For instance, according to the Oxford Dictionary of English (ODE), a resource is “[a] stock or supply of money, materials, staff, and other assets that can be drawn on by a person or organization in order to function effectively [...].” In this view, a resource is like an asset, i.e., an item that has value for and is owned by an agent. A resource does not need to be related to any action; what is required is that it has a value for some agent to “function effectively.” For example, a wrench is of value to a mechanic for performing a job even though he does not use it.
Once we move from broad dictionary definitions to application scenarios such as manufacturing, the intended meaning of resource-related notions narrows to match engineering views. Despite this, there is little agreement among experts and stakeholders on how to conceive manufacturing resources (Sanfilippo et al., 2018; Sarkar and Šormaz, 2019). Consider the following definitions taken from industrial standards: “Any device, tool and means, except raw material and final product components, at the disposal of the enterprise to produce goods and services” (ISO 15531-1; ISO, 2004a); “A resource is an entity that provides some or all of the capabilities required by the execution of the enterprise activities and/or business processes. The types of resources involved in manufacturing operational management are: personnel, material, equipment (role based and physical asset) and process segments” (IEC 62264; IEC, 2013); “Means used by an activity to transform input into output” (ISO 20534; ISO, 2018); “[T]he costs, schedule, and other impacts from the use of a thing in a process” (ISO 16739; Liebich et al., 2013).
To comment on these views, in the case of ISO 15531-1 and ISO 20534, resources are things used to produce goods (or services), i.e., to transforms inputs into outputs. ISO 16739 and IEC 62264 are more general and do not explicitly refer to input-output transformations. In addition, differently from ISO 15531-1 and ISO 20534, they include materials in the range of resources. In most cases, the standards connect resources to the needs of activities or processes. ISO 15531-1 does not consider this connection mandatory and takes availability as the characterizing property. An information system based on this standard may not reliably interoperate with a system based on, e.g., IEC 62264 because of the mismatches in the employed models.
The purpose of this paper, which develops and extends the work presented by Sanfilippo et al. (2019), is to shed light on the modeling of manufacturing resources to foster the development of a reference computational ontology in the manufacturing domain (and possibly beyond). In particular, we review in Section 2 three approaches for resource modeling by addressing their advantages and drawbacks. Section 3 presents a way to integrate the main elements of these three approaches for a unifying treatment of notions like resource, plan, and goal, among others. Section 4 presents an example for resource representation in the context of manufacturing system design. The case study is used in Section 5 to compare our approach with an existing ontology for manufacturing, therefore, to show the potential applicability of our study for knowledge and data representation. Section 6 concludes the paper by addressing the need for future research work. Finally, the Appendix reports the (logical) predicates used in the paper.
Overview of approaches to manufacturing resources
We describe in this section three approaches emerging from the literature for the representation of manufacturing resources. Our purpose is to distinguish and identify different ways in which resources are understood. We use first-order logic (FOL) to highlight the differences between the approaches, although a complete axiomatization of each view is beyond our purposes. We also rely on the Unified Modeling Language (UML) Class Diagram notation to provide an intuitive, graphical understanding of the analyzed views. However, considering the differences between FOL and UML (Berardi et al., 2005), we will not attempt to provide an exact match between FOL axioms and UML diagrams.
As anticipated in the introduction, the terminology about manufacturing resources is ambiguous because experts and stakeholders (and, as a consequence, standards) rely on different and not well aligned vocabularies (Sarkar and Šormaz, 2019; Järvenpää et al., 2019). For the sake of clarity, we use the terminology of the Process Specification Language (PSL, ISO 18629; Grüninger, 2009b), since it provides the distinction between activities and activity occurrences that is important in discussing resources. The latter are processes occurring in time, whereas the former are the activity occurrences’ descriptions, namely, their plans. The choice of interpreting PSL activities as plans is debatable because they can be also understood as activity types (Solano et al., 2014). However, the correspondence between PSL activities and plans is documented in the literature (Grüninger, 2009b). We will therefore use the terms activity and activity occurrence (or process) when discussing about ontological modeling choices.
Before moving to the next sections, we introduce some basic predicates that are common across the approaches we will discuss. As a remark on the notation, we write n-ary predicates (with
Axiom (Ax1) introduces the relation of participation (PC) between endurants (ED) and perdurants (PD). Recall that the former are entities primarily existing in space and which are able to change at some extent without loosing their identities. Examples are amounts of matter, engineering tools, persons or features (holes, pockets, bumps, etc.), among others. The latter are entities happening in time (T) like cutting, welding, waiting and similar activity occurrences and states. The predicates ED, PD, PC, and T are inherited from DOLCE and they are commonly characterized across multiple ontologies, including PSL.1
The relation of participation is inherited from DOLCE rather than from PSL because it is more generally characterized in DOLCE with respect to perdurants rather than to specific perdurants classes such as activity occurrences.
The representation of space can be further characterized in terms of, e.g., topological or geometric theories.
In PSL Core, this predicate is written occurence_of. The reader can refer to the COLORE repository (Grüninger, n.d.) for a complete overview on PSL axioms.
(if x participates in y at t, then x is an endurant, y a perdurant, and t a time)
(if x is present at t, then x is an endurant or a perdurant, and t a time)
(x is a physical endurant means that x is an endurant such that whenever it is present at time t, it is located in a space region r)
(if x satisfies y at time t, then x is present at time t and y is a description)
(if a is an activity, then a is a description)
(if o is an activity occurrence, then o is a perdurant)
(if o is an occurrence of a, then o is an activity occurrence and a is an activity)
The previous axioms hold in general while definition (Def2), given below, is specific to the manufacturing domain. We introduce it here because it provides a broad characterization of manufacturing activity occurrences and is not bound to any specific view we discuss later in the paper. According to (Def2), manufacturing activity occurrences (MfgActOcc) are activity occurrences such that at their completion a new product (Product) starts to exist. This definition embeds the view that the aim of a manufacturing process is to fabricate products. In this sense, procedures like cleaning or tuning a device are seen as parts of manufacturing activity occurrences but they are not manufacturing activity occurrences themselves (see footnote 4). The view is contentious, yet well documented in the literature (Alting, 1982; Colledani et al., 2008). Note also the constraint that a new product starts to exist at the end of the activity occurrence. This is a simplifying assumption that we keep throughout the paper. Admittedly, a product may start to exist at any stage of a manufacturing process depending on the modeling assumptions (Masolo and Sanfilippo, 2020). Also, we assume that a product exists only after the workpiece has successfully passed a quality check which completes the manufacturing process (Borgo et al., 2014).4
Since a quality test modifies an engineering quality of an entity, say changing it from unfinished to finished, one could use this fact to model an arbitrary occurrence, like a device tuning occurrence, as a manufacturing occurrence by taking the quality test to check the tuning state of the device and assuming that this transforms it into a ‘new’ device.
(o is a manufacturing activity occurrence for x means that o is an activity occurrence o, and x is a product that participates in o only at the end of o so that for all time
(o is a manufacturing activity occurrence means that it is a manufacturing activity occurrence for some product x)
Figure 1 shows a taxonomic representation of the introduced classes.

Basic high-level taxonomy.
Manufacturing resources are often conceived as entities that participate in manufacturing processes (Ammar-Khodja et al., 2008; Bonfatti et al., 1998; Sarkar and Šormaz, 2019). This can be formally captured as in (Def4).
(r is a manufacturing resource means that r is an entity participating in a manufacturing activity occurrence o for some time t)
Figure 2 shows an approximation of the notion of manufacturing resource given in (Def4).

First approach about manufacturing resources.
Definition (Def4) states that an entity is a resource independently of when it participates in a process, as long as such a process exists, has existed or will exist. Moreover, the product which is the outcome of a manufacturing process might be itself a resource for that very process.
The generality of this approach is sometimes restricted to capture only certain processes’ participants. For instance, manufacturing resources are sometimes understood as persons or things that add value to a product in its production or delivery, see, e.g., the work of Qiao et al. (2011). Although it remains unclear what adding value means, it suggests that resources contribute to the completion of the given manufacturing process.
A further variation is adopted in works based on PSL (Grüninger, 2009b), according to which manufacturing resources are required for certain activities to occur; see also what proposed by Ahmad et al. (2018) and Lemaignan et al. (2006) for similar approaches. The idea is that activities cannot occur without the specified resources. In the ontology PSL Resources this is captured by axiom (Ax7), which is stated here in our notation.
(if activity a requires r and o is the occurrence of a, then r participates in o for some time t)
The same individual resource is meant to participate in all occurrences satisfying the same activity, but this has undesired consequences. For instance, the theory cannot deal with cases in which the pre-selected resource is not available, e.g., because it is under maintenance.
To conclude, this first approach results rather limited because it heavily relies on the relation between specific resources and processes. Since in the manufacturing domain experts often need to talk of resources in planning or scheduling scenarios where there are no individual manufacturing processes to which resources can be bound, it is clear that this view needs to be extended.
In this perspective resources are conceptualized in tight connection to manufacturing activities, i.e., specifications about the activity occurrences to be realized in manufacturing contexts as discussed by, e.g., Dassisti et al. (2008), Sanfilippo et al. (2018), and Terkaj and Urgo (2012), among others. This view is more general with respect to the aforementioned approach: it weakens the direct link between resources and activity occurrences, thus enabling to model resources independently of the individual occurrences where they are meant to participate.
Definition (Def5) introduces the notion of manufacturing activity while making use of predicate ArtifactDescr, which specializes the predicate Descr for the descriptions of intentionally made entities, among which the desired outputs of activity occurrences. Looking at the formula,
(a is a manufacturing activity means that a is an activity that has an artifact description x as part, and for each manufacturing activity occurrence o of a there exists a product y satisfying x at the end of o)
Axiom (Ax8) introduces the primitive relation
(Def7) uses the superscript + in the predicate
(if x has requirement y, then x is an activity and y a description that is part of x)
(r is a resource for a at t means that r is a physical endurant, a a manufacturing activity with requirement x, and r satisfies x at time t)
(r is a manufacturing resource means that r is a resource for a manufacturing activity a at some time t)

Second approach about manufacturing resources.
To conclude, this approach allows us to deal with the representation of manufacturing resources without committing to any specific manufacturing activity occurrence. The approach is better suited for planning in comparison to what discussed in Section 2.1, since it is possible to talk about manufacturing resources without binding them directly to individual occurrences.
We introduce now a further approach to represent manufacturing resources based on goal modeling, see, e.g., the work of Sanfilippo et al. (2018). The idea is that manufacturing resources are entities employed in manufacturing scenarios to bring about agents’ goals, e.g., the goal of making a product with the desired characteristics. The advantage of this view over the previous ones is the possibility of modeling resources independently from the activities to which they are possibly related. For instance, one may conceive a driller as a manufacturing resource only because the driller is functional to achieve certain goals, rather than because there is an activity for a drilling process covering the description of the driller. From this point of view, the approach presented in this section weakens the one discussed in Section 2.2 to allow for resources modeling even in the absence of manufacturing activities.
Following the Belief-Desire-Intention (BDI) approach (Castelfranchi, 1998), one can understand goals as agents’ mental qualities referring to desired states of the world. In this view, however, it can be difficult to make sense of goal sharing (common in manufacturing contexts), e.g., when one wishes to model multiple agents having the same goal towards the production of a certain product. An alternative way to represent goals without relying on individuals’ mental states consists in objectifying and treating them as descriptions of desired world states (an approach proposed, e.g., by Guarino and Sanfilippo (2019) for the specific case of manufacturing knowledge representation). For instance, the goal of agent a to have a product with characteristics b and c is specified in a description, which is satisfied by a world state where a product with characteristics b and c exists.
Similarly to the approach in Section 2.2 to represent descriptions, axiom (Ax9) gives a minimal constraint on the relation goalForAgent. Looking at the axiom,
There are two important simplifications in this part: (1) relations like goalForAgent and desires should also have a temporal parameter as an agent may change desires over time; (2) we loosely talk of agents but obviously have in mind people while playing a role (i.e., planner, designer) in manufacturing scenarios.
(if x is a goal for agent y, then x is a description, y is an agent, and all s satisfying x at time t are such that they are states desired by y)
(x is a manufacturing goal means that x is a goal for some agent y and for each state s realizing x at t there is a product v participating in s at time t)
By looking at (Ax9) and (Def8), a manufacturing goal is satisfied by a state of the world in which there is a product that satisfies the agent’s goal. Also, the formulas bind goals neither to manufacturing activities nor to their occurrences, i.e., they do not specify how the state and the product are obtained. (Note that one can still impose temporal constraints like, e.g., that the product does not exist before the occurrence of state s.) As said, this third approach captures the notion of resource by directly linking it to goals rather than activities or activity occurrences. Assume now that we can tie manufacturing resources to manufacturing goals (e.g., comparing the actual state and the goal via functional reasoning) and let us call such a relation
(r is a manufacturing resource means that r is a physical endurant which is a resource for a manufacturing goal x)

Third approach about manufacturing resources.
In order to model the link between goals and the manufacturing activity occurrences bringing them about, manufacturing activity can be defined as in (Def10). Accordingly, a manufacturing activity has a goal such that each occurrence satisfying the activity has outcome a world state satisfying the goal and therefore the product participating in the state.
(a is a manufacturing activity means that a is an activity that includes a manufacturing goal y as part, and for each occurrence o of a, o is a manufacturing occurrence and there is a state s at the end of o satisfying y)
The three approaches presented in the previous sections are distinct views on manufacturing resources. As we have seen, the first approach (Section 2.1) is suited to model resources in tight connection to manufacturing activity occurrences. However, it is less suitable in application cases where resources are to be managed independently from manufacturing processes, as they only possibly participate in them. The second view (Section 2.2) deals with this issue by binding resources primarily to activities and only indirectly to activity occurrences. Accordingly, a manufacturing resource is an entity that is functional for a manufacturing activity, which may not be realized. Finally, the third approach (Section 2.3) is independent from the existence of both activities and activity occurrences, because it presents resources in direct connection to agents’ goals.
All three approaches have some value. The choice of adopting one approach or the other may be pragmatic for the user depending on requirements and modeling needs. More generally, it can be argued that each approach fits a subset of factory lifecycle phases (Azevedo and Almeida, 2011): manufacturing execution and control (Kádár et al., 2010; Urgo and Terkaj, 2020) when the system configuration and manufacturing plan are given (Section 2.1); detailed system design or production planning (Yang et al., 2015) when the set of products is known and the process planning has been carried out (Section 2.2); early/conceptual system design or strategic capacity planning (Terkaj et al., 2019) when limited details about product and activities are available (Section 2.3).
Instead of forcing domain experts to restrict to one single approach while excluding the others, we believe that these three views should be formally and conceptually investigated and developed into a single framework. By consistently unifying the different perspectives, the intended meanings of the used notions are harmonized and, as a result, one can facilitate multiple experts to interact, e.g., via data sharing and/or data integration procedures. On the other hand, by keeping three separated views, there is no guarantee that data coming from different parties will share common meanings even if the same terms are used; notoriously, this leads to much more complex data management workflows (Grüninger, 2009a). Considering that planning and scheduling play a fundamental role in manufacturing modeling, the second approach is definitely central to this investigation and can serve as interface in the integration of the other two approaches. Thus, in the rest of the paper we focus our attention primarily on this approach with the aim of providing a unifying ontology for the representation of manufacturing resources. By integrating the three approaches, the overall conceptual and formal framework becomes more complex. However, we believe that this complexity is inevitable for manufacturing knowledge representation and data modeling where one needs to represent resources along with activity occurrences, their goals, and the underlying activities.
Finally, it must be noted that – independently from the approach one relies on – manufacturing resources are conceptualized as roles in all the views we have considered. Accordingly, an entity is not a manufacturing resource per se but it counts as (i.e., it has the role of) manufacturing resource only when certain conditions are met. For instance, when it participates in a process or it is bound to either an activity or goal. We do not however explicitly investigate the application of role theory in the paper; the reader can refer to (Loebe, 2007; Masolo et al., 2004; Mizoguchi et al., 2015) for further readings on roles modeling.
Manufacturing resources and activities: Deepening the model
We extend in this section the activity-centered approach of Section 2.2 to develop a theory on manufacturing resources that can serve as basis for computational implementations. Before describing the theory, Section 3.1 discusses the notions of capability and capacity, and Section 3.2 looks at activities as transformations. The formalization of the proposed approach is discussed in Section 3.3.
Capabilities and capacities
Manufacturing resources are often characterized, either explicitly or implicitly, in terms of capabilities and capacities. For instance, according to the standard ISO 15531, “a resource capability defines a group of characteristics specifying manufacturing resources under functional aspects” (ISO, 2004b, p.12). The standard relies on capabilities to constrain the participation of an entity, e.g., a device, to manufacturing activity occurrences. According to this standard, a capability is the “quality of being able to perform a given activity” (ISO, 2004a, p.5). An example is the capability of a cutting tool to remove (a certain type of) material within certain dimensional tolerances. Hence, the tool can be used in a cutting activity occurrence aimed at realizing a feature (e.g., hole, slot) only because of its capability. Similarly, a machining center can be characterized in terms of capability to provide a maximum spindle speed (e.g., 15,000 rpm), to control a number of axes (e.g., 3, 4 or 5 axes), to load pallets with specific dimensions (e.g., tables
In the same standard, capacity is defined as the “measure of the quantity of product (or component) a resource can process per unit of time” (ISO, 2004b, p.24). Although it is hard to find explicit definitions of notions like capability and capacity in the literature about manufacturing, the ISO 15531 view seems to be shared across the domain (Järvenpää et al., 2019; Sarkar and Šormaz, 2019; Solano et al., 2016).
Focusing on capabilities, from the comments above it is clear that ISO 15531 understands them as resources’ functionalities, i.e., what resources – in virtue of the way in which they have been designed – are able to do. The notion of functionality is differently understood in engineering (Erden et al., 2008) and, as a consequence, differently represented in ontologies (Garbacz et al., 2011). It is beyond the scope of this paper to present an overview on these alternative approaches on functionality (see the work of Borgo et al. (2011) and references in it). They can differ quite considerably going from a behavioral perspective to a relational characterization or transformational view. Unifying approaches of engineering function theories exist as well (Mizoguchi et al., 2016; Kitamura and Mizoguchi, 2013), and these can be exploited for integrating the resource-based view proposed in this paper.
In recent works about manufacturing modeling based on the Basic Formal Ontology (Arp et al., 2015), Otte et al. (2019) and Sarkar and Šormaz (2019) propose to conceive and represent capabilities in terms of BFO’s dispositions. Leaving aside the philosophical debate on what these latter entities are (Mumford, 2003), in applied ontology they are commonly understood as objects’ characteristics which are manifested only if specific circumstances occur (Azevedo et al., 2015). For instance, the capability of a magnet to attract metal characterizes the magnet whenever the latter exists. However, as a disposition, it is manifested only when the magnet is close enough to a piece of metal and, therefore, it may never manifest. Alternatively, Borgo and Vieu (2009) characterize artifacts’ capabilities by relying on the notion of (individual) quality provided in DOLCE (Borgo and Masolo, 2009). The difference is not only theoretical but practical as well, since there are different modeling consequences. Approaches based on dispositions, like (Azevedo et al., 2015; Otte et al., 2019; Sarkar and Šormaz, 2019), require the introduction of both the manifestation trigger and the surrounding conditions: the knowledge engineer is driven to develop a system which is conceptually rich and formally complex. On the other hand, the approach based on individual qualities, like (Borgo and Vieu, 2009; Borgo et al., 2014), allows for a light modeling: one can introduce the capabilities without further conditions leaving to the knowledge engineer the choice of which information to include based on the relevant scenarios and needs.
Turning to capacities and following ISO 15531, note the similarity with capabilities: the latter model what a resource is able to do (e.g., to cut material at a certain speed), the former how many things it does (e.g., a polished threaded hole each 5 minutes). Therefore, capacities can be modeled as resources’ relational qualities making explicit the parameters’ ranges that a resource is able to satisfy in a given situation.
Activities as descriptions of transformations
The formalization of the approach to resources based on activities requires a shared understanding of what we mean by activity. In this paper a (manufacturing) activity a consists of a sequence of pairs
We assume that a list of primitive activities is given and that it suffices to generate all activities one needs to use in the modeling scenario (or for the purpose) at stake. Note that we do not commit to further requirements about granularity or coverage of the given activities. In addition, recall that the choice of conceiving activities as (descriptions of) transformations is compatible with PSL, see, e.g., the PSL theory disc (discrete) state (Grüninger, 2009b).
Let activity a be the finite sequence
Generally speaking, one can follow the modeling approach developed in this section even adopting a broader notion of activity, for instance to generalize activities beyond PSL. This can be achieved by lifting some conditions like the following:
an activity is not necessarily linear (e.g., it can be a directed acyclic graph or even include loops);
an activity is not necessarily composed of primitive activities;
completion of occurrence
completion of occurrence
activities do not need to be finite (e.g. continuous casting).
However, these generalizations require further formal constraints to ensure that the relationships between activities, activity occurrences, states, and state descriptions are as expected. The representation of such constraints goes beyond the scope of this paper.
Recall that it is useful in manufacturing to distinguish process plans from production plans. A process plan defines the set of work instructions to convert a part from its initial form to the required final form (Kamrani and Vijayan, 2008). The process plan may include the description of manufacturing processes, operational setup, process parameters, and possibly equipment and/or machine tool selection. On the other hand, based on product demand/orders, a production plan determines which production resources are to be assigned to each activity occurrence on each workpiece, when each activity occurrence is to take place, while resolving contention for the resources (Chryssolouris, 1992). Even though our attention focuses on process planning and the relation between resources and process plans, these definitions are fundamental also for production planning. Indeed, a production plan incorporates one or more process plans and resolves possible ambiguities in the process plan. Both process and production planning can be hierarchically addressed.
In order to integrate in a unified approach the three views discussed in Section 2 along with the representation of both capabilities and manufacturing activities, the latter understood as transformations, we first extend the predicate Descr. Axiom (Ax10) lists three classes of descriptions. Axiom (Ax11) specializes artifact descriptions (see Section 2.2) to either amounts of matter (
Qualities are entities qualifying and depending on their bearers, e.g., the weight-quality of a driller. They are also specific to their bearers: the weight-quality of driller
(if x is an artifact description or a manufacturing capability description or a state description, then x is a description)
(if x is an artifact description and y satisfies x at time t, then y is either an amount of matter or a physical object)
(if x is a capability description and y satisfies x at time t, then y is a quality such that for all z in which y inheres, z are physical endurants)
(if x is a state description and y satisfies x at time t, then y is a state)
Definitions (Def11)–(Def14) are introduced to re-define the notion of manufacturing activity in a way that better unifies the approaches in Section 2 and Section 3.2. (Def11) defines the relation hasGoal between an activity and a state description.8
Similarly to the Section 2.3, we treat goals as descriptions of desired states.
(x has goal y means that x is an activity with state description y as part and there is an agent z having y as goal, and for all occurrences o of x there is a state s satisfying y at the end of o)
(x has intended output y in z means that x has goal z and y is an artifact description that is part of x, and for every occurrence o of x there is an artifact p and a state s that are present at the end of o and satisfy y and z, respectively. Also, p participates in s at the end of o)
(x has resource requirement y means that x has requirement y and y is either a capability description or an artifact description)
(x has initial state requirement y means that x has requirement y, which is a state description, and for all occurrences o of x, there is a state s satisfying y at the beginning of o)
These relations are used in (Def15) to define manufacturing activity.
(a is a manufacturing activity means that a has some initial state requirement y, some resource requirement v, and some output z in state w)
For the sake of clarity, let us comment on (Def15). First, following the discussion in Section 3.2, the requirement on the initial state description establishes the conditions of the world state in order for the activity to be executed. A state description could be further characterized to describe the world state to be present for the beginning of an activity occurrence (e.g., a manufacturing environment at controlled temperature). Second, to match the goal-view of Section 2.3, the output of an activity is now associated to a goal description. Third, the resource requirement is needed to characterize resources in tandem with manufacturing activities. Accordingly, (Def16) slightly revises the definition (Def6) given in Section 2.2, where
(r is a resource for a at t means that r is a physical endurant, a a manufacturing activity with resource requirement x and r satisfies x at time t)
This new predicate is used in (Def17) to define manufacturing resource by revising (Def7).
(r is a manufacturing resource means that r is a resource for a at some time t)
In the spirit of Section 2.1, we need to bind resources to manufacturing activity occurrences but this time in tandem with manufacturing activities and their requirements. Accordingly, axiom (Ax14) establishes that for a resource to participate in a manufacturing activity occurrence, it must satisfy the resource requirements specified in the activity that the occurrence realizes.
(if a manufacturing resource r participates in manufacturing activity occurrence o at time t, then r satisfies the resource requirement x of some manufacturing activity a that o realizes)
We present in this section an industrial use case related to the design of manufacturing systems where the modeling of manufacturing resources plays a key role. The use case deals with the design of an assembly line, namely, a powertrain valve assembly on a cylinder head, as described by Ascheri et al. (2014), Ascheri (2016), and Belkadi et al. (2018). An ontology-based approach supports the integrated factory design by providing a shared common model that can consistently evolve during the design phase. The following input data are given in the case study at the design phase:
The system design phases involve several decisions, e.g., the selection of production resources to execute activities (i.e., line configuration), the grouping of activities into production stages (i.e., line balancing), as well as the optimization of the capacity of inter-operational buffers (i.e., buffer allocation problem). We assume that a proper capability assessment has already been completed and each activity can be executed by an automatic solution consisting of resources matching the requirements; alternatively, a manual solution is possible in some cases. Note that automatic and manual solutions require different sets of manufacturing resources. For example, manual assembly is carried out by human operators usually with the aid of simple power tools, whereas automatic assembly requires specific pieces of equipment for robotic handling and processing (e.g., fixtures and end effectors).
Table 1 reports some relevant data defining the use case, namely,
Use case data for powertrain valve assembly on a cylinder head
Use case data for powertrain valve assembly on a cylinder head
Even though the process plan is linear, various feasible system configurations can be designed based on the requirements and the selectable resources. Line balancing and line configuration will be carried out by considering objective function and constraints related to investment cost, operating cost, throughput, among other criteria (Belkadi et al., 2018). After line balancing has defined the assignment of activities to production stages (i.e. workstations), each workstation must include the super-set of production resources needed for all activities to be performed in that stage.
We discuss in the next section how the case study can be represented by means of both an existing approach and the ontology presented in Section 3.3 while stressing the differences between the two approaches.
We show in Section 5.1 the representation of the case study presented in the previous section by means of an existing ontology for manufacturing data modeling (Terkaj et al., 2019). By stressing the limits of this approach, we will present in Section 5.2 an alternative representation based on the theory discussed in Section 3.3. For the sake of the example, we consider only the first activity in Table 1, i.e.,
An IFC-based representation
The ontology used in this subsection provides an extensible representation of factory entities related to production systems, resources, processes, and products (Terkaj et al., 2019). It is formally represented as a modular OWL ontology based on international standards such as ISO 16739 (IFC; Liebich et al., 2013) and the W3C SSN/SOSA (Janowicz et al., 2019). For the purposes of the paper, we focus on the modules named IFC4_ADD1, IFC4_ADD1_extension, and factory (see Table 2). The first module is automatically generated from IFC (Pauwels et al., 2017), and provides a high-level characterization for classes such as product, process, and resources. The second module integrates and extends IFC4_ADD1. In particular, this extension simplifies the representation of relations between classes. Recall indeed that IFC heavily relies on the use of reified relations (Borgo et al., 2015), an approach often resulting in verbose and computationally expensive (e.g., in terms of memory) data models. We therefore adopt here a simplified version of IFC, similarly to what proposed by de Farias et al. (2015). Finally, the third module further extends IFC4_ADD1 to the manufacturing domain.
Prefixes of ontology modules that are available online
Prefixes of ontology modules that are available online
Figure 5 shows an excerpt of the ontology focused on the relation between processes and resources. A process (ifc:IfcProcess) is an event that transforms input products into output products while making use of resources under specific control rules. A resource (ifc:IfcResource) represents an entity that is needed to perform the process. In turn, various objects, such as physical products, people, and materials, can be employed as resources.

Modeling pattern in the OWL factory data model partially based on the IFC standard.
The class ifc:IfcTypeObject (and similarly the class ifc:IfcTypeResource since in IFC the latter is a subclass of the first) can be used to define “specific information about a type, being common to all occurrences of this type” (Liebich et al., 2013). Instances of ifc:IfcTypeObject are represented by sets of properties which apply to all the associated instances of Ifc:IfcObject and its subclasses. Object types can be however directly instantiated without being assigned to instances of Ifc:IfcObject (Liebich et al., 2013; Borgo et al., 2015). This approach is useful whenever the user needs to be generic or non-committal while defining the resources needed or used to execute a process.
The object property ifcext:hasAssignedObject is employed to represent both the relation between a process and the needed resources, and the relation between a resource and the objects that are used as resources. The object property ifcext:typesObject represents the relation between object types and object occurrences. Note that the properties ifcext:hasAssignedObject and ifcext:typesObject replace the use of the reified relationships ifc:IfcRelAssigns and ifc:IfcRelDefinesByType, respectively, defined in IFC.
By using this ontology, the use case presented in Section 4 can be instantiated as shown in Fig. 6 for activity
By looking at Table 1, activity

Instantiation of activity op10.
Finally, after the instantiation of the use case, it is possible to analyze the resulting OWL ontology with respect to the approach presented in Section 3:
The ontology presented in this subsection heavily relies on the use of IFC and inherits the distinction between classes like ifc:IfcObject (or ifc:IfcResource) and ifc:IfcTypeObject (ifc:IfcTypeResource). Although the distinction is useful in applications, the intended meanings of these classes are not fixed in the standard and they therefore remain open to alternative interpretations. For instance, both ifc:IfcTypeResource and ifc:IfcResource can be used to model descriptions of resources but at different levels of granularity; therefore, in order to develop computational ontologies in a homogeneous manner, one should decide how to use them and properly distinguish between their instances.
The definitions of classes ifc:IfcTypeResource and ifc:IfcResource are ambiguous in the IFC standard and there is a lack of clarifying examples. Herein, these classes are used with (at least) two different meanings, namely, to model either a generic resource description or the description of capability requirements. However, descriptions of resources and descriptions of capabilities need to be properly distinguished to enhance the transparency of both computational ontologies and data, as proposed in Section 3.
A better approach is needed to specify resources’ capabilities. Looking, e.g., at Fig. 6, the same relation ifcext:hasAssignedObject is used to link activities to either resource descriptions or capability descriptions, as well as to make explicit the relation between capabilities and resources (see, e.g., the link between workholding and pallet). However, these two interpretations should not be confused. In the approach presented in Section 3.3, the first relation corresponds to the predicate has resource requirement (
The ontology used in this section lacks a concept similar to the predicate satisfies (
The presence of alternative solutions is modeled by exploiting the type/occurrence relation (see Fig. 6). However, this possibility is not explicitly considered in the reference standard and a more formal representation would be beneficial.
We now adopt and extend the approach presented in Section 3.3 to model the use case. In the following, Table 1 is interpreted as follows. Column 1 (Activity ID) lists constants while column 2 (Activity description) lists descriptions of processes. The latter are represented as classes of manufacturing activities; e.g., the first entry – Load Cylinder Head on Pallet – refers to the activity for loading raw parts, see (Ax15).9
Further formulas can be used to cover all activities in Table 1, as well as to further characterize their intended meaning.
(if x is a load cylinder head, then x is a manufacturing activity)
(x has component requirement y means that x has requirement y and output z in s, and for all occurrences o of x, there exist a p and a v at the end of o satisfying z and y, respectively, such that v is part of p)
Formulas (f1)–(f5) represent the first operation (
We label formulas relative to the example with f. Also, we use
(
(
(pallet is an artifact description satisfying the workholding capability at time
(palletizingRobot is an artifact description satisfying the loading capability at time
(
Note that differently from the IFC-based approach presented in Section 5.1, we are now able to explicitly distinguish between the entities involved in the case study and the relations holding between them. For example, the distinction between resource and capability descriptions are explicitly stated; also, relations like has resource requirements, satisfies, has component requirement, and has output are useful to provide a clear representation of the case study.
The research work presented in the paper is motivated by the need of investigating the foundational grounds for resource modeling in manufacturing. We started from three existing high-level approaches which are well motivated from both an ontological and manufacturing stance. The choice of relying on one or the other depends on the modeling requirements that an ontology should satisfy, as well as on the level of abstraction one wishes to achieve. Our contribution has been presented in Section 3, where the main features of the three approaches are unified in a single framework. In this way, end-users have the possibility of representing manufacturing resources by taking into account activities, goals, and activity occurrences happening in time. Hence, one can model application scenarios within or across various phases of factory lifecycle, e.g., design, planning, scheduling, or execution.
Further work on the treatment of resources is needed at both the foundational and application levels. First, we have tacitly assumed that resources are organized in different high-level classes, e.g., resources that execute manufacturing processes and resources that undergo processes, among others. The development of a taxonomy of resources is therefore needed to classify and characterize them in a proper manner. Second, as we have seen in Section 1, resources are sometimes understood in connection to ownership or availability conditions. Clearly, a resource has to be available in a specific environment for it to be used. Also, ownership of resources is particularly relevant in modern scenarios (e.g. Cloud Manufacturing) where one has the possibility of using third-party technologies. Therefore, characterizing the business dimension of resources can make a difference for application settings. Third, we gave only a quick look at the modeling of resources’ capabilities. This topic needs to be further investigated to be suitable for implementation. A comparison with theories about engineering functionalities is required to understand the differences and similarities between functionalities and capabilities. Also, since capabilities can be more or less complex (Järvenpää et al., 2019), a robust formal approach for their representation is needed.
Finally, the theory presented in this paper gives the backbone of our approach. While we showed how it works, only a properly extended and refined version (in some computational logic) can be used to handle data in engineering applications and, possibly, to exploit automatic reasoning over data.
Footnotes
Acknowledgements
We wish to thank Nicola Guarino, Lorenzo Solano, Pedro Rosado, Fernando Romero, and Marcello Urgo for previous discussions on the modeling of manufacturing resources leading to this paper. We also thank the reviewers for their useful comments.
Appendix
Overview of the predicates used in the paper
| Predicate | Informal reading | Source |
| x is an activity | PSL | |
| x is an activity occurrence | PSL | |
| x is an agent | – | |
| x is an amount of matter | DOLCE | |
| x is an artifact description | – | |
| the beginning time of perdurant x | – | |
| x is a description | – | |
| agent x desires the state satisfying y | – | |
| x is an endurant | DOLCE | |
| x is the ending time of perdurant x | – | |
| x is the description of a goal desired by agent y | – | |
| x is an activity with component requirement y | – | |
| x is an activity with goal y | – | |
| x is an activity with initial state requirement y | – | |
| x is an activity with output y in state z | – | |
| x is an activity with requirement y | – | |
| x is an activity with resource requirement y | – | |
| x is a quality inhering in y | DOLCE | |
| x is located in space region r at time t | – | |
| x is an activity for loading cylinder heads | – | |
| x is an activity occurrence satisfying activity y | PSL | |
| , , | x is a manufacturing activity | – |
| x is a manufacturing activity occurrence | – | |
| x is a manufacturing activity occurrence with output y | – | |
| x is the description of a manufacturing capability | – | |
| x is a manufacturing goal description | – | |
| , , , | x is a manufacturing resource | – |
| x participates in y at t | DOLCE | |
| x is a perdurant | DOLCE | |
| x is a physical endurant | DOLCE | |
| x is a physical object | DOLCE | |
| x is present at time t | DOLCE | |
| x is part of y at t | mereological relation | |
| x is proper part of y | mereological relation | |
| x is a product | – | |
| x is an individual quality | DOLCE | |
| , , | x is a physical endurant satisfying a description in the manufacturing activity y (at time t) | – |
| activity x requires resource r | PSL | |
| x satisfies the description y at time t | – | |
| x is a space region | – | |
| x is a state | DOLCE | |
| x is the description of a state | – | |
| x is a time span | – | |
| ≺, ⪯ | ordering relations between time spans | – |
| + | mereological sum | mereological relation |